Left Alvecote at 9.05 heading for the Atherstone flight went through 5 locks and then had torrential rain and the boat engine decided to die we were opposite Barry Hawking boatyard so an engineer came out and changed our deisel warter seperator filter which was blocked we went through the next lock and moored up 2.45. we were all soaked through so we stayed for the night.
No comments:
Post a Comment